Permits to work and checklists
A permit to work says what job, where, who, from when to when, which hazards, which precautions, and who signed it. Work outside those limits is not permitted.
Check four things before you start: the permit is signed by the responsible officer; the time is valid now; the precautions are ticked as done (for example "atmosphere tested", "ventilation running", "standby person at the entrance"); and the communication method is agreed.
If something changes (the gas reading, the weather, the time runs out), the permit stops. Stop work, leave the space and report.
- Valid from 0900 to 1200 means you must be out and finished by 1200.
- "N/A" on a checklist = not applicable (it does not apply here). It is not the same as "not done".
Check this lesson
Question 1/2
The checklist line "Standby person at entrance" is not ticked. You ...