ECDIS practice quiz: 40 questions
Forty study questions on ECDIS, each with the answer and a short explanation with its source. Pick an answer, then open the explanation.
These are our own practice questions, written from IMO, IHO and MAIB documents. They are not an official question bank of IMO, any flag State, any training centre or IMO model course 1.27, and there is no pass mark. ialacolreg.com is not affiliated with any of them.
ECDIS, ECS and plotters
1.Which statement describes an ECS (electronic chart system)?
Answer and explanation
A. It shows charts and position but cannot meet the SOLAS chart carriage rule
IHO S-66 quotes ISO 19379: an ECS displays position and chart data but does not meet all IMO requirements for ECDIS and is not intended to satisfy SOLAS chart carriage. There is no IMO performance standard for ECS.
ECDIS, ECS and plotters
2.IMO guidance lists four things an ECDIS needs to meet the SOLAS chart carriage requirement. Which of these is NOT one of them?
Answer and explanation
B. The ship carries a second ECDIS from another maker
MSC.1/Circ.1503/Rev.2 (paragraph 6): type-approved, up-to-date ENCs, kept compatible with the latest IHO standards, and adequate independent backup. A second ECDIS is one common backup, but it need not come from another maker, and paper charts can also serve.
SOLAS carriage
3.For ships other than high-speed craft, over which period was mandatory ECDIS carriage phased in?
Answer and explanation
C. Between 1 July 2012 and 1 July 2018
MSC.1/Circ.1503/Rev.2: carriage under SOLAS V/19.2.10 entered into force in stages between 1 July 2012 and 1 July 2018. High-speed craft had to carry ECDIS from 1 July 2008.
SOLAS carriage
4.A passenger ship of 600 GT on international voyages was built in 2020. Must it carry ECDIS?
Answer and explanation
D. Yes, new passenger ships of 500 GT and upwards must carry it
Under SOLAS V/19, passenger ships of 500 GT and upwards built on or after 1 July 2012 must be fitted with ECDIS (IMO; IHO S-66 schedule). The 3,000 GT threshold is for tankers and cargo ships.
SOLAS carriage
5.Which existing cargo ships (not tankers) were left out of the ECDIS retrofit schedule?
Answer and explanation
A. Ships under 10,000 GT built before 1 July 2013
The S-66 schedule retrofits existing cargo ships of 50,000 GT and upwards (2016), 20,000 to under 50,000 GT (2017) and 10,000 to under 20,000 GT (2018). Existing cargo ships under 10,000 GT are not in it.
Performance standards
6.An ECDIS is installed in March 2027. Which IMO performance standard may it meet?
Answer and explanation
B. Either MSC.232(82) or MSC.530(106)
MSC.530(106) operative paragraph 2: equipment installed on or after 1 January 2026 but before 1 January 2029 may conform to either MSC.232(82) or MSC.530(106).
Performance standards
7.From which date must every newly installed ECDIS meet MSC.530(106)?
Answer and explanation
C. 1 January 2029
MSC.530(106): equipment installed on or after 1 January 2029 must conform to the new standard. That is also when IHO's roadmap says S-100 ECDIS becomes mandatory for new installations.
Safety settings and alerts
8.If the officer does not set a safety contour, what value does ECDIS use?
Answer and explanation
D. 30 metres
MSC.530(106) paragraph 5.8.1: if the mariner does not specify a safety contour, it defaults to 30 m, and an indication is shown.
Safety settings and alerts
9.You enter a 12 m safety contour, but the ENC only has 10 m and 20 m contours. What does ECDIS use?
Answer and explanation
A. The 20 m contour, with an indication
If the chosen value is not in the data, the safety contour defaults to the next deeper contour, with an indication (MSC.530(106) 5.8; IHO S-67 4.4.1). Deeper, not shallower, so you are kept on the safe side.
Safety settings and alerts
10.What does the safety depth setting do?
Answer and explanation
B. Highlights soundings equal to or shallower than the value
MSC.530(106) 5.9: ECDIS emphasizes soundings equal to or less than the safety depth whenever spot soundings are displayed. The anti-grounding alarm works from the safety contour.
Safety settings and alerts
11.In the IMO performance standard, which of these is classed as an alarm?
Answer and explanation
C. Deviation from the planned route
MSC.530(106) appendix 5 lists two alarms: passing closer than the set distance to the safety contour, and deviation from route. Positioning failure and datum mismatch are warnings; a larger scale ENC is an indication.
Safety settings and alerts
12.What does ECDIS show when you zoom in beyond the scale the ENC was made for?
Answer and explanation
D. An overscale indication
"Information overscale" is an indication in MSC.530(106) appendix 5. IHO S-67 warns that overscaling gives a false sense of accuracy, so heed it.
Safety settings and alerts
13.Your ECDIS gives a "different geodetic datum" warning. What does it mean?
Answer and explanation
A. The position input and the chart data are not on the same datum
MSC.530(106) 11.4.13: the positioning system and the system database should be on the same geodetic datum, and ECDIS gives a warning if they are not.
Safety settings and alerts
14.Why should you not navigate with only the "display base" on screen?
Answer and explanation
B. IMO says it is not sufficient for safe navigation
MSC.530(106) 3.6: the display base cannot be removed but is not intended to be sufficient for safe navigation. The standard display is the minimum for planning and monitoring.
Safety settings and alerts
15.Which display mode is the minimum to use during route planning and route monitoring?
Answer and explanation
C. The standard display
MSC.530(106) 3.5: the standard display is the display mode intended to be used as a minimum during route planning and route monitoring. It must be selectable with one action.
ENC, RNC and S-101
16.Which statement about ENCs and RNCs is true?
Answer and explanation
D. An RNC is a scanned image of a paper chart
IHO S-66: a raster chart is a scanned, passive image of a paper chart; a vector chart (ENC) is a database of chart objects. Only ENC data lets ECDIS raise automatic depth alarms.
ENC, RNC and S-101
17.When may an ECDIS be used in RCDS (raster) mode?
Answer and explanation
A. Where no ENC is available, with a folio of up-to-date paper charts
MSC.1/Circ.1503/Rev.2 paragraphs 32–33: RCDS mode is used when ENCs are not available; it does not have full ECDIS functionality and can only be used together with an appropriate portfolio of up-to-date paper charts.
ENC, RNC and S-101
18.Can an RNC raise an automatic anti-grounding alarm from the chart's depths?
Answer and explanation
B. No, only lines the mariner adds can raise alerts
Circ.1503 appendix 2: RNCs will not trigger automatic alarms, but alarms and indications can be generated by manually adding clearing lines, a ship safety contour, isolated danger markers and danger areas during planning.
ENC, RNC and S-101
19.An ECDIS is loaded with private, unofficial charts. How is it regarded?
Answer and explanation
C. As an ECS, not an ECDIS
IHO S-66: if private charts are used in an ECDIS, the system is regarded as operating as an ECS, which does not meet the SOLAS chart carriage requirement.
ENC, RNC and S-101
20.What is S-101?
Answer and explanation
D. The IHO S-100 based specification for ENCs
S-101 is the IHO product specification for ENCs under the S-100 data model. IHO approved its operational edition in December 2024; it will gradually replace S-57 ENCs.
ENC, RNC and S-101
21.What does the IHO roadmap plan for the S-57 to S-101 transition?
Answer and explanation
A. The same ENC coverage in both S-57 and S-101 for a period
The IHO S-100 roadmap (v5.0, October 2025) plans identical coverage in S-57 and S-101 for a transition period, so ECDIS already installed keeps working. No end date for S-57 has been fixed.
ENC, RNC and S-101
22.In IHO's S-100 roadmap, what does "dual fuel" mean?
Answer and explanation
B. A new ECDIS able to load both S-57 and S-101 ENCs
The roadmap's dual fuel model: new ECDIS brought to market as S-101 coverage starts must process both S-57 and S-101 ENCs in parallel, with a seamless presentation.
CATZOC
23.What does CATZOC describe?
Answer and explanation
C. The assessed quality of the charted depths
IHO S-67: the category of zone of confidence describes the quality of the depth data, based on position accuracy, depth accuracy and seafloor coverage.
CATZOC
24.Which CATZOC category has a position accuracy of ±500 m?
Answer and explanation
D. C
IHO S-67 table 4-1: A1 ±5 m + 5% of depth, A2 ±20 m, B ±50 m, C ±500 m. D is worse than C.
CATZOC
25.Your planned route crosses an area marked ZOC U. What does IHO advise?
Answer and explanation
A. Treat it with the same caution as a ZOC D
U means the data has not yet been assessed. IHO S-67 says it is good practice to treat ZOC U areas with the same degree of caution as ZOC D.
CATZOC
26.How many stars does ZOC A2 show on the ECDIS?
Answer and explanation
B. Five
IHO S-67: A1 shows 6 stars, A2 5 stars, B 4, C 3 and D 2. U is shown with the letter U.
CATZOC
27.Why should CATZOC affect the cross-track distance you use for the route check?
Answer and explanation
C. Dangers may lie further from where drawn
IHO S-67 advises taking the horizontal accuracy of the ZOC into account when setting the cross-track distance for the automatic route check: in ZOC C a danger may be up to 500 m from its charted position.
Route checking and monitoring
28.The automatic route check lists hundreds of warnings. What is good practice?
Answer and explanation
D. Review each warning and inspect the route at a large scale
IMO asks for a careful visual inspection of the entire route in the "all" or "other" display, and the route check results must be reviewed. On Muros the warnings were ignored and the route was checked on a small-scale chart.
Accident lessons
29.In the CSL Thames grounding (MAIB report 2/2012), what was wrong with the safety contour?
Answer and explanation
A. It was set to 10 m, less than the ship's 10.63 m draught
MAIB found a 10 m safety contour inappropriate for CSL Thames's 10.63 m draught. The visual alarm activated but the audible alarm did not work, and no type-specific training or familiarisation had been given.
Accident lessons
30.According to MAIB report 24/2014, why did Ovit's ECDIS route run over the Varne Bank?
Answer and explanation
B. A junior officer planned it and nobody checked it
MAIB: the passage was planned by an inexperienced and unsupervised junior officer and was not checked by the master before departure or by the officer of the watch at the start of his watch.
Accident lessons
31.What did the MAIB find about the ECDIS safeguards on Muros (report 22/2017)?
Answer and explanation
C. They were ignored, overlooked or disabled
MAIB: ECDIS safeguards were ignored, overlooked or disabled. The audible alarm had been disabled, and the route check's warnings about Haisborough Sand were ignored.
Route checking and monitoring
32.What does IMO mean by the risk of over-reliance on ECDIS?
Answer and explanation
D. Trusting the screen without independent checks
Circ.1503 appendix 3: training should explain why ECDIS should not be relied on as the sole aid to navigation, and stress a proper lookout and periodic position checks by ECDIS-independent methods.
Route checking and monitoring
33.How should the ECDIS position be checked during a watch?
Answer and explanation
A. Regularly, by methods independent of ECDIS
IMO guidance stresses periodic checking of the ship's position by ECDIS-independent methods, such as radar ranges, visual bearings and soundings, together with a proper lookout.
Training
34.Which of these is generic ECDIS training under STCW?
Answer and explanation
B. A course meeting the STCW competences, often on model course 1.27
Generic training meets the ECDIS competences added by the 2010 Manila amendments (STCW Code tables A-II/1 and A-II/2). IMO model course 1.27 is the usual basis. Familiarization on the ship's own model is separate.
Training
35.Who must make sure an officer is familiarized with the ECDIS model fitted on board?
Answer and explanation
C. The company, under STCW I/14 and ISM
MSC.1/Circ.1503/Rev.2: STCW regulation I/14 and ISM Code section 6.3 require companies to provide familiarization, including the ECDIS, its backup and sensors, and to keep evidence of it.
Training
36.Which IMO model course covers the operational use of ECDIS?
Answer and explanation
D. Model course 1.27
IMO model course 1.27, Operational Use of Electronic Chart Display and Information Systems (ECDIS), is named in MSC.1/Circ.1503/Rev.2 and IHO S-66.
Training
37.An officer serves only on ships without ECDIS and has no ECDIS training. What does the STCW endorsement show?
Answer and explanation
A. A limitation for ships fitted with ECDIS
Circ.1503 footnote: ECDIS training is not required for those who serve exclusively on ships not fitted with ECDIS, and this limitation is reflected in the endorsement issued.
Performance standards
38.For how long does ECDIS keep its detailed record at one-minute intervals?
Answer and explanation
B. The previous 12 hours
MSC.530(106) 11.5: ECDIS records time, position, heading, speed, the official data used and changes to safety settings for the previous 12 hours at one-minute intervals, plus the whole voyage track with time marks at least every 4 hours.
SOLAS carriage
39.What must an adequate ECDIS backup arrangement allow?
Answer and explanation
C. Safe takeover and safe navigation to the end
Circ.1503 paragraph 11: backup must allow a safe takeover of ECDIS functions so a failure does not become critical, and safe navigation for the remaining part of the voyage.
Safety settings and alerts
40.What happens when the officer deselects the safety contour alarm?
Answer and explanation
D. ECDIS must show a permanent indication
MSC.530(106) 11.4.3: there should be a permanent indication when the safety contour alarm is deselected. On Muros and CSL Thames, missing audible alarms were part of what went wrong.
Sources
- IMO — Electronic nautical charts (ENC) and ECDIS
- IMO — MSC.1/Circ.1503/Rev.2, ECDIS: Guidance for Good Practice (28 November 2022)
- IMO — Resolution MSC.530(106), Performance standards for ECDIS (adopted 7 November 2022)
- IHO — S-66, Facts about Electronic Charts and Carriage Requirements (Edition 1.1.0, January 2018)
- IHO — S-67, Mariners' Guide to Accuracy of Depth Information in ENCs (Edition 1.0.0, September 2020)
- IHO — Roadmap for the S-100 Implementation Decade 2020–2030 (v5.0, October 2025)
- IHO — Operational editions of S-100 standards approved (news, 13 January 2025)
- MAIB — Report 2/2012: grounding of CSL Thames in the Sound of Mull
- MAIB — Report 24/2014: grounding of Ovit on the Varne Bank, Dover Strait
- MAIB — Report 22/2017: grounding of Muros on Haisborough Sand
