Navigation · IMO, IHO and MAIB

ECDIS: a plain guide for deck officers

An ECDIS is a navigation system tested and type-approved against the IMO performance standard. With official, up-to-date electronic navigational charts (ENCs) and an adequate, independent backup, it meets the SOLAS rule to carry charts. A chart plotter or other electronic chart system (ECS) can help you navigate, but it does not meet that rule.

  • 2012–2018ECDIS phased in on ships on international voyagesSOLAS V/19, IHO S-66
  • 30 mdefault safety contour if you set noneIMO performance standard
  • 1 Jan 2029S-100 ECDIS required in new installationsMSC.530(106)
  • Since 2010generic ECDIS training required by STCWManila amendments

Checked against IMO, IHO and MAIB documents on 11 November 2026 · 11 min read

On this page
  1. ECDIS, ECS and a chart plotter
  2. When a ship must carry ECDIS (SOLAS V/19)
  3. Which performance standard applies
  4. ENC or RNC, and the move from S-57 to S-101
  5. Safety contour, safety depth and the alerts you set
  6. CATZOC: how good is the survey under you?
  7. Route planning and checking
  8. Over-reliance and what the groundings teach
  9. Training: generic and type-specific
  10. Keep studying
  11. Frequently asked questions

ECDIS (electronic chart display and information system) is the type-approved chart system most SOLAS ships now navigate with. This guide explains what it is, when it is required, how its charts and safety settings work, and what accident investigators found when it was used badly.

The basicsECDIS, ECS and a chart plotter

The screens can look alike. The difference is approval and the data they use.

  • ECDIS with ENCs

    Type-approved to the IMO performance standard (tested, for example, to IEC 61174), using official ENCs kept up to date, with safety contour, route check and alarms.

    Meets SOLAS chart carriage, when it also has an adequate, independent backup.

  • ECDIS in RCDS mode

    The same ECDIS showing official raster charts (RNCs), scanned images of paper charts, where no suitable ENC exists. It cannot read depths from the image.

    Only together with an appropriate folio of up-to-date paper charts.

  • ECS or chart plotter

    Any electronic chart system not certified to the IMO ECDIS standard, from a handheld GPS to a bridge computer. An ECDIS loaded with private (unofficial) charts also counts as an ECS.

    Never. On a SOLAS ship the paper chart stays the official basis for navigation.

The rulesWhen a ship must carry ECDIS (SOLAS V/19)

SOLAS regulation V/19 requires ships to carry up-to-date charts for the intended voyage. Since 2002 an ECDIS may meet that requirement, and amendments adopted in 2009 made ECDIS compulsory for certain ships on international voyages, in stages from 1 July 2012 to 1 July 2018. High-speed craft have had to carry it since 1 July 2008.

IMO's good practice guidance (MSC.1/Circ.1503/Rev.2) sums up what an ECDIS needs to count as your charts: it must be type-approved, use up-to-date ENCs, be kept compatible with the latest IHO standards, and have adequate, independent backup arrangements.

The backup must let you take over safely if ECDIS fails, so the failure does not become a critical situation, and must let you navigate safely for the rest of the voyage. A second ECDIS or a folio of paper charts are the usual answers. The backup charts need updating too.

Ship typeSizeNew shipsExisting ships
Passenger ships500 GT and upwardsBuilt on or after 1 July 2012By the first survey on or after 1 July 2014
Tankers3,000 GT and upwardsBuilt on or after 1 July 2012By the first survey on or after 1 July 2015
Cargo ships (not tankers)10,000 GT and upwardsBuilt on or after 1 July 201350,000 GT and upwards: first survey on or after 1 July 2016
Cargo ships (not tankers)3,000 to under 10,000 GTBuilt on or after 1 July 2014Not required to retrofit
Cargo ships (not tankers)20,000 to under 50,000 GTCovered aboveFirst survey on or after 1 July 2017
Cargo ships (not tankers)10,000 to under 20,000 GTCovered aboveFirst survey on or after 1 July 2018
The phase-in schedule, as IHO S-66 sets it out. All dates have now passed. Flag States could exempt ships due to leave service permanently within two years of their date. Always check your flag State's own rules. IHO — S-66, Facts about Electronic Charts and Carriage Requirements (Edition 1.1.0, January 2018) ↗

ApprovalWhich performance standard applies

An ECDIS must meet the IMO performance standard in force when it was installed. Resolution MSC.530(106), adopted on 7 November 2022, sets the dates:

InstalledPerformance standard
1 January 1996 to before 1 January 2009A.817(19), as amended by MSC.64(67) and MSC.86(70)
1 January 2009 to before 1 January 2026MSC.232(82)
1 January 2026 to before 1 January 2029Either MSC.232(82) or MSC.530(106)
On or after 1 January 2029MSC.530(106), which adds S-100 data such as S-101 ENCs
IMO — Resolution MSC.530(106), Performance standards for ECDIS (adopted 7 November 2022) ↗

Chart dataENC or RNC, and the move from S-57 to S-101

An ENC (electronic navigational chart) is a vector database: every buoy, depth contour and wreck is an object the system can read. It is issued by or for a government hydrographic office and follows IHO standards. Today's ENCs use the IHO S-57 format.

An RNC (raster navigational chart) is a scanned image of an official paper chart. In RCDS mode ECDIS can display it, but it cannot work out depths from a picture: no automatic anti-grounding alarm, no safety contour unless you draw one in, and no clicking on features for information. IMO allows RCDS mode only where ENCs are not available, and only with an appropriate folio of up-to-date paper charts.

S-101 is the new ENC format, built on the IHO S-100 data model. IHO approved its operational edition in December 2024. Under MSC.530(106), S-100 ECDIS may be used from 1 January 2026 and is required for new installations from 1 January 2029.

The IHO roadmap plans the same coverage in S-57 and S-101 for a transition period, so ships with existing ECDIS keep working. New ECDIS sold during the transition must read both formats; IHO calls this the dual fuel model. IHO has not fixed a date when S-57 production stops.

On the bridgeSafety contour, safety depth and the alerts you set

These settings turn a picture of the chart into a system that can warn you. IMO's performance standard defines them; your company's procedures say what values to use.

  • Safety contour

    The depth contour that separates safe from unsafe water for your ship. You choose a value; ECDIS uses that contour if the ENC has it, or the next deeper one, and draws it boldly. If you set nothing, it defaults to 30 m. Water shallower than it is shaded as unsafe.

  • Safety depth

    A depth used to highlight spot soundings: soundings equal to or shallower than it stand out when soundings are displayed. It does not on its own raise the anti-grounding alarm.

  • Look-ahead (anti-grounding)

    A time or distance ahead of the ship. ECDIS raises an alarm if, within it, the ship will pass closer than your chosen distance to the safety contour. If you switch this alarm off, the screen must show a permanent indication.

  • Cross-track limit

    How far the ship may drift off the planned leg. Exceed it and ECDIS gives an off-track alarm.

  • Critical points

    Points on the route where you want a warning in advance, such as a turn or a pilot station.

  • Standard display

    The minimum chart content to use for planning and monitoring, selectable with one action. The smaller display base cannot be removed, but IMO says it is not sufficient for safe navigation.

PriorityWhat it tells youClause
AlarmThe ship will pass closer than the set distance to the safety contour11.4.3
AlarmDeviation from the route (cross-track limit exceeded)11.4.5
WarningPositioning system failure (position, heading or speed input lost)11.4.11
WarningApproach to a critical point on the route11.4.12
WarningPosition source and chart data on different geodetic datums11.4.13
Warning, caution or indicationApproaching an area with special conditions, such as a traffic separation zone, area to be avoided or restricted area11.4.4
Warning, caution or indicationApproaching a selected danger, such as a wreck or rock shallower than the safety contour11.4.6
IndicationDefault safety contour in use, information overscale, larger scale ENC available, no ENC available, display customizedApp. 5
Alerts in the IMO performance standard (MSC.530(106), appendix 5). An alert is an audible and/or visual announcement; its priorities are alarm, warning and caution. An indication is visual information only. The largest scale data in the system is always used for the safety contour and area alerts, whatever scale you are looking at.

Survey qualityCATZOC: how good is the survey under you?

Every ENC carries zones of confidence (ZOC) for its depth data. The category (CATZOC) is based on position accuracy, depth accuracy and how completely the seabed was searched. ECDIS can show it, usually as stars. IHO publication S-67 explains it for mariners.

ZOCStarsPosition accuracyDepth accuracySeabed coverage
A16±5 m + 5% of depth0.50 m + 1% of depthFull area search; significant features found and measured
A25±20 m1.00 m + 2% of depthFull area search; significant features found and measured
B4±50 m1.00 m + 2% of depthNo full search; uncharted hazards not expected, but may exist
C3±500 m2.00 m + 5% of depthNo full search; depth anomalies may be expected
D2Worse than CWorse than CNo full search; large depth anomalies may be expected
UUNot assessedNot assessedQuality not yet assessed

IHO's advice: look at the ZOC whenever you plan or change a route. Allow for the horizontal accuracy when you set the cross-track distance for the route check. In ZOC C, D and U, charted depths may be much shallower in reality and dangers may not be charted at all. Treat U with the same caution as D.

Passage planningRoute planning and checking

ECDIS plans faster than a pencil, but the errors move, they do not disappear. A checklist built from the IMO standard and guidance:

  1. Make sure you have the full set of ENCs for the voyage at suitable scales, latest editions and updates applied, including on the backup.
  2. Set the safety contour, safety depth, look-ahead and cross-track limits for this ship, this draught and this voyage before you plan.
  3. Show the ZOC and widen your margins where the survey is poor.
  4. Run the automatic route check and review every result. A long list of warnings is a reason to tidy the settings, not to stop reading.
  5. Inspect the whole route by eye at a large scale in the "all" or "other" display. IMO notes that some systems miss small dangers on small-scale charts during the route check.
  6. Have the master check and approve the plan, and check it again when it is changed at sea.
  7. Underway, check the position by means independent of ECDIS (radar ranges and bearings, visual bearings, depths) and keep a proper lookout.

Lessons from accidentsOver-reliance and what the groundings teach

IMO says ECDIS training must cover its limits: its sensors, the accuracy of hydrographic data, the difference between ENC and RNC, and human error. A trainee should be able to explain why ECDIS must not be relied on as the only aid to navigation, and why the position must be checked by other means.

The UK Marine Accident Investigation Branch (MAIB) has investigated several groundings where ECDIS was set up or used badly. Their reports are free to read and worth it:

  • CSL Thames

    Sound of Mull, Scotland · 9 August 2011

    • The safety contour was set to 10 m, inappropriate for the ship's 10.63 m draught.
    • The visual alarm came on, but the audible alarm did not work.
    • No training or familiarisation on the type of ECDIS fitted had been given.

    Set the safety contour for the real draught, and make sure the alarm can be heard.

  • Ovit

    Varne Bank, Dover Strait · 18 September 2013

    • The route on the ECDIS passed directly over the bank.
    • An inexperienced, unsupervised junior officer planned it; neither the master nor the officer of the watch checked it.
    • The chart scale and settings were unsuitable and the audible alarm did not work. It took the officer 19 minutes to realise the ship was aground.

    Check the plan, and monitor the ship against the real world, not only against the line on the screen.

  • Muros

    Haisborough Sand, North Sea · 3 December 2016

    • The route was changed less than 3 hours before and never seen or approved by the master.
    • It was checked by eye on a small-scale chart, and the route check's warnings were ignored.
    • The audible alarm had been disabled. MAIB found the safeguards were ignored, overlooked or disabled.

    Use the route check, look at large scale, and never disable the alarms.

TrainingTraining: generic and type-specific

  • Generic ECDIS training

    Required by the STCW Convention since the 2010 Manila amendments (STCW Code tables A-II/1 and A-II/2) for masters and deck officers serving on ECDIS-fitted ships, in force from 2013 with full implementation by 1 January 2017. Courses usually follow IMO model course 1.27, Operational use of ECDIS. Your maritime administration approves the course providers.

  • Type-specific familiarization

    Training on the exact ECDIS model on your ship, its backup, sensors and connected equipment. STCW regulation I/14 and section 6.3 of the ISM Code make the company responsible for it and for keeping evidence. Manufacturers are encouraged to supply type-specific material.

  • If you never sail with ECDIS

    Officers who serve only on ships without ECDIS do not need the training, but their certificate endorsement then carries that limitation.

Course length, price and certificate details are set by each administration and training centre, not by IMO, so we do not quote them here.

Keep studying

Frequently asked questions

What does ECDIS stand for?

Electronic chart display and information system. IMO defines it as a navigation information system that, with adequate backup arrangements, can be accepted as meeting the SOLAS requirement to carry up-to-date charts.

Is a chart plotter an ECDIS?

No. A plotter, or any electronic chart system not type-approved to the IMO ECDIS standard, is an ECS. IHO S-66 explains that an ECS is not intended to meet the SOLAS chart carriage rule, so a SOLAS ship using one must keep and use up-to-date paper charts.

Which ships must carry ECDIS?

Under SOLAS V/19, passenger ships of 500 GT and upwards, tankers of 3,000 GT and upwards and cargo ships of 3,000 GT and upwards on international voyages, phased in from 2012 to 2018 (existing cargo ships under 10,000 GT were not required to retrofit). High-speed craft have carried it since 2008.

What is the difference between an ENC and an RNC?

An ENC is a vector database the ECDIS can read, so it can raise anti-grounding alarms. An RNC is a scanned picture of a paper chart: ECDIS can show it in RCDS mode, but it gives no automatic depth alarms, and IMO allows it only with a folio of up-to-date paper charts.

What is S-101 and when does it start?

S-101 is the new IHO ENC format based on S-100. S-100 ECDIS may be used from 1 January 2026 and must be fitted in new installations from 1 January 2029. S-57 and S-101 ENCs will be produced side by side during the transition.

What is the default safety contour?

30 metres, if the mariner does not set one. If you enter a value that is not a contour in the ENC, ECDIS uses the next deeper contour and shows an indication.

Is there an official ECDIS exam question bank?

Not a public one. ECDIS competence is assessed in approved STCW courses and in the certificate-of-competency exams of each administration. Our quiz is our own study material written from IMO and IHO sources, not an official bank.